-
Phone
+886-2-26824939
-
Address
2F. No.216-2, Zhongzheng Rd., Shulin Dist., New Taipei City 238, Taiwan
-
E-mail
Does Clamping Pressure Affect Thermal Grease Pump-out?
Yes. In an accelerated Purdue study, lower squeezing pressure — and a thicker bond line — led to much more voiding and thermal degradation. What this means for mounting design.How Do You Test A Thermal Paste For Pump-out?
Power cycling, thermal cycling and accelerated mechanical cycling can all reveal pump-out. What each test simulates, what to measure, and how to set it up close to the real application.How Many Thermal Cycles Until Thermal Grease Pumps Out?
There is no fixed number — it depends on the grease, temperature swing, package and pressure. In one NREL study, voids appeared after 30 cycles from −40°C to 125°C. How to estimate for your product.What Is The Difference Between Pump-out And Dry-out?
Pump-out moves thermal grease out of the interface mechanically; dry-out changes the grease itself at high temperature. How to tell them apart and why the fix is different.Does TIM Certification Apply To Every Color Or Grade?
Not necessarily. Safety listings can be specific to a grade, thickness or color. How to check that the exact material you buy is the one covered.How Long Does It Take To Qualify A Second-source TIM?
Reliability testing usually sets the pace — 1,000 hours of aging is about six weeks of chamber time. How to plan the stages in parallel to shorten the total.Which Reliability Tests Are Typical For TIM Qualification?
Dry heat at 125–150°C, damp heat at 85°C/85% RH, temperature cycling from −40°C and vibration, with thermal resistance tracked over time. How to choose and how to judge results.What Documents Should You Request From A New TIM Supplier?
TDS, SDS, RoHS and REACH declarations, certification evidence, reliability data, lot certificates and a change-notification commitment. What each document is for.